Previous: Plan View Controls Next: Value Plan View Control Table of contents Images Frames Unidata's Integrated Data Viewer > Display Controls > Gridded Data Displays

5.1.1 Flow Plan Control
Overview
The Flow Plan View Control is used to control plan (horizontal) displays (flow vectors, wind barbs, streamlines) of vector based data (e.g., wind components). It is similar to the Plan View controls. You can toggle between the vector and streamlines view and control the vector size, color and skip interval.
images/FlowPlanViewControlGui.gif
Properties
  • Vector Size

    The length of the vectors can be changed with the Size combo box. This is also an editable box, enter a new size and press return.

  • Skip interval

    To avoid cluttering the display you can define the number of grid points that are skipped with the Skip interval combo box. A skip interval of 0 mean show all grid values, 1 means skip every other one, 2 means show every third one, etc.

  • Show Streamlines

    Click on Show Streamlines to toggle between vectors and streamlines. When displaying as stream lines the Density slider allows you to change the density of the display.

  • Color

    The color button is both the color of the selector point and the color of the vectors in the display.

  • Line Width

    Set the line width in the display. Click on the to change the value.

  • Smoothing

    This control has an option to smooth the grid that can be used to smooth contour lines or flow fields for display. There are 6 types of smoothing: 5-point, 9-point and gaussian weighted, Cressman, circular and rectangular aperture smoothers. The amount of smoothness can be set for the gaussian smoother. The higher the amount, the smoother the grid. For the Cressman, circular and rectangular aperture, the factor is the radius in grid spacing units.

  • Levels

    Click on the Levels box to see a pull down menu of the native grid levels. Click on one level value to reset the plan to that level. The plan level in use is shown in the data's native altitude units. The Levels box is editable. Click in the box, enter a value and hit return to set your own value.

    Click on the Cycle check box to animate vertically through all available levels.

 


Previous: Plan View Controls Next: Value Plan View Control Table of contents Images Frames Unidata's Integrated Data Viewer > Display Controls > Gridded Data Displays