Thanks for the update, Gilbert.
Out of curiosity, has anyone heard anything about data from the other
instruments coming over NOAAPort?
-Mike
======================
Mike Zuranski
Meteorology Support Analyst
College of DuPage - Nexlab
Weather.cod.edu
======================
On Wed, Dec 13, 2017 at 4:36 PM, Gilbert Sebenste <gilbert@xxxxxxx> wrote:
> In case you didn’t hear...there will be more testing before it is finally
> commissioned one week from today.
>
> Gilbert
>>
>> 595
>> NOUS72 KNES 132228
>> ADMNES
>> *SUBJECT: ADMINISTRATIVE (UPDATE #1): UPDATED INFORMATION ON GOES-16 DRIFT
>> AND
>> TRANSITION PLAN, ISSUED: DECEMBER 13, 2017 1830 UTC
>> UPDATE #1: GRB WILL RESUME BY 1615 UTC ON DECEMBER 14, 2017. ALL OTHER DATA
>> FLOWS WILL RESUME BETWEEN 1530-1545 UTC AS ORIGINALLY INDICATED.
>>
>>
>> TOPIC: GOES-16 DRIFT AND TRANSITION PLAN
>>
>> DATE/TIME ISSUED: DECEMBER 13, 2017 1830 UTC
>>
>> PRODUCT(S) OR DATA IMPACTED: ALL GOES-16 ABI, GLM, SUVI, SEISS, MAG, AND
>> EXIS PRODUCTS
>>
>> DATE/TIME OF INITIAL IMPACT: NOVEMBER 30, 2017 1300 UTC
>>
>> DATE/TIME OF EXPECTED END: DECEMBER 20, 2017 TBD UTC
>>
>> LENGTH OF OUTAGE: SEE DETAILS BELOW.
>>
>> DETAILS/SPECIFICS OF CHANGE: THE GOES-16 DRIFT AND TRANSITION PLAN REMAINS
>> LARGELY UNCHANGED FROM THE DECEMBER 6, 2017 NOTIFICATION. THIS NOTIFICATION
>> SERVES TO PROVIDE ADDITIONAL SPECIFIC INFORMATION AND MINOR UPDATES.
>> ANOTHER NOTIFICATION UPDATE WILL BE SENT THIS WEEK. ALL PLANS AND DATES ARE
>> SUBJECT TO CHANGE.
>>
>> GOES-16 COMPLETED DRIFT ON DECEMBER 11, 2017 AND IS POSITIONED IN ITS FINAL
>> OPERATIONAL LOCATION OF 75.2 DEGREES WEST.
>>
>> ON DECEMBER 14, 2017 BETWEEN 1530-1545 UTC, GOES-13 DIRECT GVAR WILL BE
>> DISABLED. GOES-13 GVAR AND LRIT WILL BE RELAYED THROUGH GOES-14 GVAR UNTIL
>> JANUARY 3, 2018 AT WHICH TIME THE GOES-13 GVAR RELAY THROUGH GOES-14 GVAR
>> WILL BE DISABLED AND THE SATELLITE WILL BEGIN DRIFTING ON JANUARY 4TH TO
>> ITS STORAGE LOCATION AT 60 DEGREES WEST.
>>
>> ON DECEMBER 14, 2017 BETWEEN 1530-1545 UTC, DATA FLOW RESUMES TO USERS OF
>> THE SBN, PDA, GNC-A, AND CLASS IN THE SAME MANNER IN WHICH THEY WERE
>> DISTRIBUTED PRIOR TO SATELLITE DRIFT. GRB, DCS, HRIT-EMWIN, AND SARSAT WILL
>> BE ENABLED AS SOON AS GOES-13 DIRECT GVAR IS DISABLED IN THIS TIME PERIOD.
>> ADDITIONAL TESTING WILL OCCUR AFTER DATA FLOW RESUMES AND GOES-13 WILL
>> REMAIN THE OPERATIONAL GOES-EAST SATELLITE UNTIL GOES-16 IS DECLARED THE
>> OPERATIONAL GOES-EAST SATELLITE NO LATER THAN DECEMBER 20, 2017.
>>
>> A NOTIFICATION WILL BE SENT IN ADVANCE OF THE OFFICIAL GOES-16 OPERATIONAL
>> DECLARATION AND PRIOR TO DISABLING GOES-13 ON JANUARY 3, 2018.
>>
>> KEY POINTS:
>>
>> -
>>
>> DECEMBER 6, 2017 AT APPROXIMATELY 1900 UTC, THE METADATA IN ALL GOES-16
>> DATA FILES FOR ALL INSTRUMENTS CHANGED FROM GOES-TEST TO GOES-EAST
>> -
>>
>> DECEMBER 7, 2017: GOES-13 GVAR RELAY THROUGH GOES-14 GVAR BEGAN (GOES-13
>> GVAR STILL TRANSMITS UNTIL DECEMBER 14TH TO ALLOW USERS TIME TO REPOINT
>> ANTENNAS)
>> -
>>
>> DECEMBER 11, 2017: GOES-16 DRIFT ENDED AND CALIBRATION ACTIVITIES BEGAN
>> -
>>
>> DECEMBER 14, 2017: GOES-13 GVAR AND LRIT AVAILABLE ONLY THROUGH GOES-14
>> GVAR AS OF 1545 UTC
>> -
>>
>> DECEMBER 14, 2017: BETWEEN 1530-1545 UTC GOES-16 DATA DISTRIBUTION
>> RESUMES
>> -
>>
>> GOES-16 GRB, DCS, HRIT/EMWIN AND SARSAT ARE ACTIVATED
>> -
>>
>> DATA FLOW RESUMES TO USERS OF THE SBN, PDA, GNC-A, AND CLASS IN THE
>> SAME MANNER IN WHICH THEY WERE DISTRIBUTED PRIOR TO TRANSITION
>> TO GOES-EAST
>> -
>>
>> GOES-16 PRODUCTS CONTINUE VALIDATION TOWARDS PROVISIONAL AND FULL
>> MATURITY LEVELS
>> -
>>
>> GOES-13 REMAINS THE OPERATIONAL GOES-EAST SATELLITE UNTIL GOES-16 IS
>> DECLARED THE OPERATIONAL GOES-EAST SATELLITE
>> -
>>
>> DECEMBER 14-20, 2017: GOES-EAST OPERATIONAL STATUS WILL BE DECLARED FOR
>> GOES-16
>> -
>>
>> PROVISIONAL PRODUCTS (ABI L1B AND CMI) NO LONGER REQUIRE
>> PRELIMINARY, NON-OPERATIONAL DATA CAVEAT LANGUAGE
>> -
>>
>> NO MANEUVERS / SPECIAL OPERATIONS DURING CHRISTMAS HOLIDAYS
>> -
>>
>> NO GOES-EAST TRANSITION / INTERRUPTION DURING DESIGNATED CRITICAL
>> WEATHER DAYS
>> -
>>
>> JANUARY 3, 2018: GOES-13 WILL STOP TRANSMITTING DATA
>> -
>>
>> JANUARY 4, 2018: GOES-13 WILL BEGIN DRIFT TO STORAGE LOCATION
>> -
>>
>> JANUARY 22, 2018: GOES-13 WILL REACH STORAGE LOCATION AT 60 DEGREES WEST
>>
>>
>> CONTACT INFORMATION FOR FURTHER INFORMATION: KATHRYN MOZER AT
>> KATHRYN.MOZER@xxxxxxxx OR SPSD.USERSERVICES@xxxxxxxx
>>
>> WEB SITE(S) FOR APPLICABLE INFORMATION:
>>
>> SEE HTTP://WWW.GOES-R.GOV/USERS/TRANSITIONTTOOPERATIONS.HTML OR
>> HTTP://WWW.OSPO.NOAA.GOV/OPERATIONS/GOES/16/TRANSITION.HTML FOR ADDITIONAL
>> INFORMATION.
>>
>> THIS MESSAGE WAS SENT TO ESPC.NOTIFICATION@xxxxxxxx. YOU HAVE BEEN SENT
>> THIS AND OTHER NOTIFICATIONS BECAUSE YOU HAVE OPTED IN TO RECEIVE IT. IF
>> FOR ANY REASON, YOU WISH TO UNSUBSCRIBE, PLEASE CONTACT ESPC HELP DESK AT
>> ESPCOPERATIONS@xxxxxxxx OR (301) 817-3880. PLEASE NOTE: IT MAY TAKE UP TO
>> TWO BUSINESS DAYS TO PROCESS YOUR UNSUBSCRIBE REQUEST.
>>
>> =
>>
> _______________________________________________
> NOTE: All exchanges posted to Unidata maintained email lists are
> recorded in the Unidata inquiry tracking system and made publicly
> available through the web. Users who post to any of the lists we
> maintain are reminded to remove any personal information that they
> do not want to be made public.
>
>
> ldm-users mailing list
> ldm-users@xxxxxxxxxxxxxxxx
> For list information or to unsubscribe, visit:
> http://www.unidata.ucar.edu/mailing_lists/