NOTE: The nws-changes
mailing list is no longer active. The list archives are made available for historical reasons.
926 NOCN04 CWAO 041830 GENOT NO. 067 CCB CANADIAN DATA DISTRIBUTION DISRUPTION ELECTRICAL WORK PERFORMED AT THE CANADIAN METEOROLOGICAL CENTRE (CWAO) ON THURSDAY, SEPTEMBER 05, 1996 AND SATURDAY, SEPT. 07, 1996, WILL REQUIRE 2 SHUTDOWNS OF THE DATA SWITCH. THE SHUTDOWNS WILL OCCUR BETWEEN 0715Z-0845Z ON SEPTEMBER 05 AND AT 0915Z-1045Z ON SEPTEMBER 07, 1996. CANADIAN ALPHANUMERIC METEOROLOGICAL AND AVIATION DATA WILL BE QUEUED DURING BOTH SHUTDOWNS AND RELEASED WHEN THE DATA SWITCH IS BROUGHT BACK ON LINE. INTERRUPTION DE LA DISTRIBUTION DES DONNEES CANADIENNES DES TRAUVAUX SUR LE SYSTEME DE DISTRIBUTION ELECTRIQUE DU CENTRE METEOROLOGIQUE CANADIEN (CWAO) FORCERONT L'ARRET DU COMMUTATEUR DE DONNEES PRINCIPAL A 2 REPRISES. LE 05 SEPTEMBRE, 1996 ET LE 07 SEPTEMBRE 1996. LES INTERRUPTIONS SE PRODUIRONT ENTRE 0715Z-0845Z LE 5 SEPTEMBRE, ET ENTRE 0915Z-1045Z LE 07 SEPTEMBRE, 1996. LES DONNEES METEOROLOGIQUES ALPHANUMERIQUES ET LES DONNEES POUR L'AVIATION SERONT MISES EN QUEUE DURANT LES DEUX ARRETS ET SERONT TRANSMISES A LA FIN DES TRAVAUX. MCBEAN/ADMA/TORONTO
nws-changes
archives: