NOTE: The nws-changes
mailing list is no longer active. The list archives are made available for historical reasons.
705 NOUS40 KWBC 301121 FOS/NOAAPORT NOTICE NO. 1092 JUNE 30... 1997 ATTN FOS/NOAAPORT USERS SUBJECT ERROR CONTROL CHANGES PLANNED FOR NOAAPORT SATELLITE BROADCAST OUR EARLY EXPERIENCE WITH THE NOAAPORT SATELLITE BROADCAST NETWORK /SBN/ HAS SHOWN THE NEED FOR IMPROVEMENTS IN THE TECHNIQUE USED FOR ERROR CONTROL. ACCORDINGLY AN ALTERNATIVE DATA CODING SCHEME PROVIDING FORWARD ERROR CORRECTION HAS BEEN DEVISED AND IS CURRENTLY UNDER TEST. UPON SUCCESSFUL COMPLETION OF THE TESTS AND ACCEPTANCE OF THE RESULTS BY THE NATIONAL WEATHER SERVICE A DESIGN CHANGE WILL BE MADE IN THE SBN AFFECTING THE MASTER GROUND STATION /MGS/ AND ALL OF THE AWIPS SITE GROUND STATIONS /SGS/. NOAAPORT RECEIVE SYSTEM /NRS/ USERS WILL ALSO BE AFFECTED IN THAT THE REPLACEMENT DATA CODING SCHEME WILL BE INCOMPATIBLE WITH THAT NOW IN USE. THE REPLACEMENT SCHEME IS A ROBUST CONCATENATED TYPE WHICH COMBINES THE FEATURES OF A CONVOLUTIONAL ENCODER A DATA INTERLEAVER AND A REED-SOLOMON ERROR CORRECTION CODE. A NEW SBN DEMODULATOR MODEL SDR54A PRODUCED BY EFDATA CORPORATION WILL INCORPORATE THE FORWARD ERROR CORRECTION SCHEME AND THESE DEMODULATORS WILL BE INSTALLED IN THE NWS SGS SITES THROUGH A PHASED CUT-OVER PLAN. THE NOAAPORT RECEIVE SYSTEM DOCUMENTATION WILL BE UPDATED TO REFLECT THE CHANGES IN THE CODING SCHEME TO ENABLE CONSTRUCTION AS AN ALTERNATIVE TO PURCHASE OF A MANUFACTURED DEMODULATOR. MORE INFORMATION ON THIS IS EXPECTED TO BE FORTHCOMING IN THE NEAR FUTURE AND WILL BE DISTRIBUTED TO THOSE ON THE NOAAPORT MAILING LIST. THE PERTINENT CHARACTERISTICS OF THE NEW DATA STREAM CODE ARE AS FOLLOWS NWSTG CHANNEL DATA RATE 1536 KBPS GOES EAST CHANNEL DATA RATE 1536 KBPS GOES WEST CHANNEL DATA RATE 1536 KBPS MODULATION QPSK SCRAMBLER ON CONVOLUTIONAL CODE CONSTRAINT LENGTH K 7 CONVOLUTIONAL CODE RATE 3/4 INTERLEAVE DEPTH 16 REED-SOLOMON CODE /N K T/ /225 205 10/ PER IESS - 308 APPENDIX G REED-SOLOMON SYMBOL SIZE 8 BITS IF THE REPLACEMENT SYSTEM IS ACCEPTED IT IS PLANNED TO PHASE IN THE INSTALLATION THROUGH A TRANSITION PLAN NOW PROJECTED TO BEGIN IN EARLY SEPTEMBER AND COMPLETE BY MID-SEPTEMBER. THE PLAN REQUIRES THAT THE SATELLITE BROADCAST FREQUENCIES FOR ALL CHANNELS BE SHIFTED SEQUENTIALLY. AFTER COMPLETION OF THE TRANSITION THE NEW FREQUENCIES WILL BE DOWNLINK DOWNLINK BANDWIDTH CARRIER /MHZ/ IF /MHZ/ /KHZ/ ------------- -------- --------- NWSTG 3990.225 1159.755 1550 GOES EAST 3994.1 1155.9 1550 GOES WEST 3991.775 1158.225 1550 RICHARD K. THIGPEN CHIEF NETWORK MONITORING ANALYSIS BRANCH OFFICE OF SYSTEMS OPERATIONS NATIONAL WEATHER SERVICE 301-713-0864X164 RICHARD.THIGPEN NOAA.GOV END NNNN
nws-changes
archives: