200618: NCEP testing 6/19-ADMIN NOTICE NOUS42 KWNO (fwd)

NOTE: The nws-changes mailing list is no longer active. The list archives are made available for historical reasons.

733
NOUS42 KWNO 180249
ADMNFD
SPECIAL NCEP DISCUSSION
CENTRAL OPERATIONS/NCEP/NWS/WASHINGTON DC
0250 UTC MON JUNE 18 2001

180245Z...00Z NCEP MODEP PRODUCTION IS ON SCHEDULE...THE ASOS
OB FROM CXY HAS HAD BAD DEW PT TEMPS SINCE 03Z YESTERDAY...

ATTN ALL NWS PRODUCTION SUITE USERS....

THE QUARTERLY TEST OF BACKUP PROCESSING FOR NCEP COMPUTER
OPERATIONS IS SCHEDULED FOR 19 JUNE 2001...THIS TEST IS SIMILAR
TO THE FEB 6 2001 TEST...DURING THE TEST BACKUP PRODUCTS...NOGAPS
AFWA FSL AND UKMET GUIDANCE WILL BE DISSEMINATED IN PLACE OF THE
12Z ETA AVN AND NWW3 AS WELL AS SEVERAL CYCLES OF THE RUC2 AND THE
RSAS MODEL GUIDANCE WHICH ARE PRODUCED ON THE IBM ASP...OUTAGE
SHOULD LAST FOUR HOURS...THE 12Z NGM AND NGM MOS WILL BE DISTRIBUTED
AT THE CONCLUSION OF THE TEST....

...NOTE...THE UKMET GRIB BULLETINS WILL CONTAIN THE EGRR IN THE cccc
PART OF THE HEADER.....NOT KWBC.....

THE BACKUP DATE FOR THIS TEST IF CANCELED WILL BE 20 JUNE 2001.

MORE DETAILED INFORMATION CAN BE FOUND AT....NOTE THAT URL IS
ALL LOWER CASE EXCEPT FOR PMB..

http://www.ncep.noaa.gov/nco/PMB/ncep_backup.html


WHITMORE/SDM/NCO/NCEP
NNNN


---------- End Forwarded Message ----------




  • 2001 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the nws-changes archives: