20020830: SPC operations resumed-ADMIN NOTICE NOUS42 KWNO (fwd)

NOTE: The nws-changes mailing list is no longer active. The list archives are made available for historical reasons.




442
NOUS42 KWNO 300830
ADMNFD
SPECIAL NCEP DISCUSSION
CENTRAL OPERATIONS/NCEP/NWS/WASHINGTON DC
0820 UTC FRI AUG 30 2002

300820Z...THE NCEP PRODUCTION CYCLE IS ON TIME..
THE 06Z ETA IS DONE WITH OUTPUT TO 42HRS..THE
00Z MRF IS DONE AND THE 06Z AVN SHOULD START
ON TIME AT 0847Z..

...UPDATE ON STORM PREDICTION CENTER POWER OUTAGE...

THE ELECTRICAL WORK AT SPC WAS FINISHED AT 30/05Z AND
SPC HAS RESUMED ALL NORMAL OPERATIONS AS OF 30/0815Z..
AND THE BACKUP OPERATIONS AT AFWA ENDED AT 30/0815Z..
THE FIRST PRODUCT FROM SPC WILL BE THE 30/13Z DAY-1
CONVECTIVE OUTLOOK..SPC WILL RESUME ISSUING MESOSCALE
DISCUSSIONS..WATCH STATUS MESSAGES..AND OUTLOOK
PROBABILITIES AS NEEDED..THANKS FOR YOUR PATIENCE
WITH THIS POWER UPS WORK..

SMITH/SDM/NCO/NCEP
NNNN



---------- End Forwarded Message ----------




  • 2002 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the nws-changes archives: