20040622: data queuing-ADMIN NOTICE NOUS72 KNCF (fwd)

NOTE: The nws-changes mailing list is no longer active. The list archives are made available for historical reasons.



676
NOUS72 KNCF 221011
ADMNCF
~
PLEASE PASS TO MIC/HIC,ESA ITO,AND SOO
.
THE SCHEDULED OPERATIONAL TEST OF THE AWIPS NETWORK
CONTROL FACILITY (NCF)BACKUP CAPABILITY WILL BEGIN IN
ONE HOUR. AS STATED IN PREVIOUS NOTIFICATIONS, THE REPOINTING
OF ALL NCF MESSAGE DISTRIBUTION WILL REQUIRE APPROXIMATELY
20 MINUTES TO PERFORM. DATA WILL BE QUEUED WHILE THIS
SWITCH IS IN PROGRESS AND THE QUEUED DATA WILL BE SENT
ONCE THE SWITCH IS COMPLETED.
.
ONCE THE SWITCH IS COMPLETED THE BNCF WILL HANDLE ALL
OPERATIONAL FUCTIONS OF THE AWIPS NETWORK CONTROL
FACILITY UNTIL OPERATIONS ARE SWITCHED BACK TO THE
ANCF AT 0015 UTC ON 06/23/04. PHONE CALLS TO THE NCF
(301-713-9344)WILL BE AUTOMATICALLY FOREWARDED TO
THE BNCF.
.
NCF

---------- End Forwarded Message ----------



  • 2004 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the nws-changes archives: