NOTE: The nws-changes
mailing list is no longer active. The list archives are made available for historical reasons.
FROM: John H. Ward Chief, Production Management Branch Subject: Changes to the NWS Production Suite 1. Due to critical weather for Hurricane Ivan, there were non crisis implementations this week. If Hurricane Jeanne proceeds towards the East Coast as predicted, next week's implementations will be delayed as well. Every attempt will be made to complete all planned implementations prior to the upcoming moratorium. 2. The transition of NCEP operations to the Phase II system is expected to begin on or about 12 October 2004, with the system expected to become operational on or about 18 January 2005. Based on the current installation schedule, the moratorium on changes to the Production Suite is expected to begin on or about 1 October and end in January 2005. No further requests for changes to be made prior to the moratorium will be accepted. Changes required to correct operational failures will continue to be made during the moratorium. 3. The transition in the file naming convention for the Global Forecast System (GFS) has begun. A duplicate file structure has been established on both the TOC and NCEP FTP servers. All file structures containing AVN now has a duplicate link containing GFS. These duplicate file structures will remain in place for six months. On approximately 18 January 2005, all file structures containing AVN will be eliminated. Additional details about this transition can be found at the following web site: http://www.nco.ncep.noaa.gov/pmb/changes/avn-gfs_rename.html
nws-changes
archives: