NOTE: The nws-changes
mailing list is no longer active. The list archives are made available for historical reasons.
---------- Forwarded Message ---------- 1. The transition of NCEP operations to the Phase II Central Computing System (CCS) is proceeding on schedule. Full parallel operations began on the primary system on 15 November and on the backup system on 6 December. The Phase II system is scheduled to become operational on Tuesday, 25 January 2005. Information on the transition, such as file name changes and system differences, are currently being compiled. This information is available at the following web location: http://www.nco.ncep.noaa.gov/pmb/docs/ccs_transition CCS users should check this page regularly for updates. 2. The file naming convention change has been expanded to include the Eta model run, which will be called the North American Mesoscale (NAM) run. All forecast runs will be referenced by the area of responsibility for the run rather than a forecast model name: Global Forecast System (GFS) rather than AVN or Spectral model; and North American Mesoscale (NAM) rather than Eta. All file structures containing old names have duplicate links containing the new model run designators on the NCEP and NWS FTP servers. On 25 January 2005, all file structures containing old names will be eliminated. Additional details about this transition can be found at the following web site: http://www.nco.ncep.noaa.gov/pmb/changes/model_rename.html
nws-changes
archives: