NOTE: The nws-changes
mailing list is no longer active. The list archives are made available for historical reasons.
084 NOUS42 KWNO 241713 ADMNFD SPECIAL NCEP DISCUSSION CENTRAL OPERATIONS/NCEP/NWS/WASHINGTON DC 1710 UTC THU MAR 24 2005 241710Z..CCS PROBLEMS TURNED OUT TO BE CAUSED BY THE NETWORK CONFIGURATION ISSUES BETWEEN CCS AND CAMP SPRINGS..THE GFS BEYOND 78HRS WAS DELAYED 40-45 MINUTES. WAVE PRODUCTS..ENSEMBLES..ABOUT AN HOUR DELAY. RSAS AND RUC PRODUCTS WERE SENT OUT THROUGH THE BACKUP..AS WAS THE RADAR SUMMARY PRODUCT WITH ONLY SLIGHT DELAYS. THANKS FOR YOUR PATIENCE. NEWBY/SDM/NCO/NCEP NNNN ---------- End Forwarded Message ----------
nws-changes
archives: