20060127: NCEP update

NOTE: The nws-changes mailing list is no longer active. The list archives are made available for historical reasons.

<snip>

1.  The moratorium on changes at the NWS Telecommunications Operations Center (TOC) is expected to end in mid to late February.  As soon as the moratorium is lifted NCEP will begin the transition from GRIB1 to GRIB2, by placing duplicate GRIB2 files on the TOC FTP server.  Both sets of data will remain on the TOC FTP server for a minimum of 180 days.

2.  The level-II radar LDM feed will be turned on to the CCS/White at 12 UTC on 7 February 2006. 


<snip>



  • 2006 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the nws-changes archives: