NOTE: The nws-changes
mailing list is no longer active. The list archives are made available for historical reasons.
757 NOUS72 KNCF 101815 ADMNCF PLEASE PASS TO THE MIC/HIC, SOO, ESA, ITO AND AWIPS FOCAL POINT: . THERE WILL BE AN PARTIAL OPERATIONAL TEST OF THE AWIPS NETWORK CONTROL FACILITY (NCF) BACKUP SERVERS. THE SERVER OPERATION WILL BE SWITCHED FROM THE PRIMARY AWIPS NCF (ANCF) AT SILVER SPRING, MD TO THE BACKUP NCF (BNCF) AT FAIRMONT, WV. THE TEST IS SCHEDULED FOR WEDNESDAY, 15 MARCH FROM 1415 UTC TO 1815 UTC. THE TEST WILL NOT BE DONE ON A CRITICAL WEATHER DAY, OR IF THERE ARE OTHER SIGNIFICANT OPERATIONAL ISSUES WARRANTING POSTPONEMENT. . ALL ANCF MESSAGE DISTRIBUTION WILL BE REPOINTED TO THE BNCF. THE SWITCH TO THE BNCF WILL BEGIN AT 1415 UTC AND WILL TAKE ABOUT 20 MINUTES. DATA WILL QUEUE WHILE THE SWITCH IS IN PROGRESS AND WILL BE SENT ONCE THE SWITCH IS COMPLETE. THIS WILL AFFECT DATA ORIGINATING AT NWS FIELD OFFICES AND NATIONAL CENTERS ON THE AWIPS NETWORK INCLUDING RADAR DATA. . REPOINTING OF OPERATIONS BACK TO THE ANCF WILL ALSO TAKE ABOUT 20 MINUTES DURING WHICH DATA WILL BE QUEUED. QUEUED DATA WILL BE SENT WHEN THE REPOINTING IS COMPLETE. . IF THERE ARE ANY QUESTIONS, PLEASE CALL THE NCF AT 301-713-9344. . NCF/GLC ---------- End Forwarded Message ---------- \
nws-changes
archives: