[nws-changes] [20071023: Power Work Scheduled-Fwd: ADMIN NOTICE NOUS72 KNCF]

NOTE: The nws-changes mailing list is no longer active. The list archives are made available for historical reasons.



-------- Original Message --------

996 NOUS72 KNCF 231707
ADMNCF
PLEASE PASS TO THE MIC/HIC, SOO, ESA, ITO AND AWIPS FOCAL POINT: . DUE TO POWER WORK SCHEDULED TO TAKE PLACE THIS WEEKEND AT NOAA HEADQUARTERS IN SILVER SPRING, MD; NCF OPERATIONS WILL BE SWITCHED FROM THE PRIMARY AWIPS NCF (ANCF) IN SILVER SPRING, MD TO THE BACKUP NCF (BNCF) AT FAIRMONT, WV. THE SWITCH IS SCHEDULED FOR THURSDAY, 25 OCTOBER AT 1515 UTC. OPERATIONS WILL BE SWITCHED BACK TO THE PRIMARY NCF ON MONDAY, 29 OCTOBER AT 1315 UTC. THE SWITCH WILL NOT BE DONE ON A CRITICAL WEATHER DAY, OR IF THERE ARE OTHER SIGNIFICANT OPERATIONAL ISSUES WARRANTING POSTPONEMENT. . ALL ANCF MESSAGE DISTRIBUTION WILL BE REPOINTED TO THE BNCF. THE SWITCH TO THE BNCF WILL BEGIN AT 1515 UTC AND WILL TAKE ABOUT 20 MINUTES. DATA WILL QUEUE WHILE THE SWITCH IS IN PROGRESS AND WILL BE SENT ONCE THE SWITCH IS COMPLETE. THIS WILL AFFECT DATA ORIGINATING AT NWS FIELD OFFICES AND NATIONAL CENTERS ON THE AWIPS NETWORK INCLUDING RADAR DATA. . REPOINTING OF OPERATIONS BACK TO THE ANCF WILL ALSO TAKE ABOUT 20 MINUTES DURING WHICH DATA WILL BE QUEUED. QUEUED DATA WILL BE SENT WHEN THE REPOINTING IS COMPLETE. .
NCF





  • 2007 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the nws-changes archives: