[nws-changes] [Fwd: NWS BACKUP NETWORK CONTROL FACILITY ACTIVATION]

NOTE: The nws-changes mailing list is no longer active. The list archives are made available for historical reasons.



-------- Original Message --------

*All,
*

*.
DUE TO POWER WORK SCHEDULED TO TAKE PLACE THIS
WEEKEND AT NOAA HEADQUARTERS IN SILVER SPRING, MD; NCF OPERATIONS WILL BE SWITCHED FROM THE PRIMARY
AWIPS NCF (ANCF) IN SILVER SPRING, MD TO THE BACKUP
NCF (BNCF) AT FAIRMONT, WV.   THE SWITCH IS SCHEDULED FOR
THURSDAY, 25 OCTOBER AT 1515 UTC.  OPERATIONS WILL BE SWITCHED
BACK TO THE PRIMARY NCF ON MONDAY, 29 OCTOBER AT 1315 UTC. THE SWITCH WILL NOT BE DONE ON A CRITICAL WEATHER DAY, OR IF THERE ARE OTHER SIGNIFICANT OPERATIONAL ISSUES WARRANTING POSTPONEMENT. .
ALL ANCF MESSAGE DISTRIBUTION WILL BE REPOINTED TO THE BNCF.
THE SWITCH TO THE BNCF WILL BEGIN AT 1515 UTC AND WILL TAKE
ABOUT 20 MINUTES.  DATA WILL QUEUE WHILE THE SWITCH IS IN
PROGRESS AND WILL BE SENT ONCE THE SWITCH IS COMPLETE.  THIS
WILL AFFECT DATA ORIGINATING AT NWS FIELD OFFICES AND NATIONAL
CENTERS ON THE AWIPS NETWORK INCLUDING RADAR DATA.
.
REPOINTING OF OPERATIONS BACK TO THE ANCF WILL ALSO TAKE
ABOUT 20 MINUTES DURING WHICH DATA WILL BE QUEUED. QUEUED DATA WILL BE SENT WHEN THE REPOINTING IS COMPLETE.
.
NCF

*