NOTE: The nws-changes
mailing list is no longer active. The list archives are made available for historical reasons.
-------- Original Message -------- 862 NOUS72 KNCF 162036 ADMNCF . SUBJECT: GALAXY-15 MITIGATION PLANS . THE POTENTIAL INTERFERENCE RISK IDENTIFIED BY THE AWIPS SATTLITE BROADCAST NETWORK (SBN) PROVIDER WHEN THE GALAXY 15 'ROUGE' SATELLITE TRAVERSES THE SES-1 ORBITAL POSITION, WILL END ON DECEMBER 18TH. . ON SUNDAY DECEMBER 19TH AT 0500Z, THE TEMPORARY MASTER GROUND STATION (MSG) CONFIGURATION WILL BE REMOVED AND THE AWIPS UPLINK WILL BE RETURNED TO THE BACKUP MGS STATION LOCATED IN FAIRMONT WV. ON MONDAY DECEMBER 20TH AT 1515Z, THE AWIPS UPLINK WILL BE RETURNED TO THE PRIMARY MGS LOCATED IN HAUPPAUGE NY. . THE RETURN OF SBN OPERATIONS TO THE BACKUP MASTER GROUND STATION IN FAIRMONT WV AND/OR TO THE PRIMARY MASTER GROUND STATION IN HAUPPAUGE NY, IS NOT EXPECTED TO INTERRUPT TRAFFIC ON THE AWIPS SBN. ANY PRODUCTS IMPACTED BY THE RETURN TO PRIMARY SBN OPERATIONS WILL BE REBROADCASTED OVER THE AWIPS SBN. . NCF/SEG
nws-changes
archives: