Hi,
I'm able to plot my data, and following the example in Test30.java
I've added date/time labels. However, now that I've made the switch
from "1, 2, 3" to the date/time labels, it seems one of my sets is
causing VisAD to go into an infinite loop. The data set has only 1
point. It's a 2D plot, time along the x axis. The plot begins to draw
and the y axis appears (correctly drawn), then I get "please wait" in
the lower left corner and that's it.
Any suggestions?
Thanks!
Paul
------------------------
Paul Gifford, Capt, USAF
NOAA/NGDC
325 S Broadway EGC2
Boulder CO 80303
303-497-6556 voice
303-497-6513 fax