Re: Plot stuck in loop?

Hi Paul,

>   I'm able to plot my data, and following the example in Test30.java
> I've added date/time labels.  However, now that I've made the switch
> from "1, 2, 3" to the date/time labels, it seems one of my sets is
> causing VisAD to go into an infinite loop.  The data set has only 1
> point.  It's a 2D plot, time along the x axis.  The plot begins to draw
> and the y axis appears (correctly drawn), then I get "please wait" in
> the lower left corner and that's it.

I put together a little application that mapped Time to the
XAxis, and displayed a FlatField (Time -> something) with
only one sample, and also displayed a Real of type Time and
a RealTuple that included Time.  All of them displayed OK
without any infinite "please wait".  My app enabled axis
scales.  Could you send me a copy of your application (and
data so I can run it)?

Cheers,
Bill
----------------------------------------------------------
Bill Hibbard, SSEC, 1225 W. Dayton St., Madison, WI  53706
hibbard@xxxxxxxxxxxxxxxxx  608-263-4427  fax: 608-263-6738
http://www.ssec.wisc.edu/~billh/vis.html


  • 2000 messages navigation, sorted by:
    1. Thread
    2. Subject
    3. Author
    4. Date
    5. ↑ Table Of Contents
  • Search the visad archives: